REGIONAL PLANNING
CCPG - Rule 3627 - PSCo Substation Projects
The following projects are classified as “Substation” and
consist of constructing a new switching station or substation, or
upgrading an existing station.
- Arapahoe 90 MVAR Capacitor (.pdf)
- Bluestone Substation (.pdf)
- Cameo 45 MVAR Capacitor Bank (.pdf)
- Chambers 230/115 kV, 280 MVA #2 (.pdf)
- Cherokee 90 MVAR Capacitor Bank (.pdf)
- Godfrey Breaker Station and 25 MVAR Capacitor Bank (.pdf)
- Happy Canyon Substation (.pdf)
- Harvest Mile 230/345 kV Substation (.pdf)
- Hopkins 230/115 kV 100 MVA #2 (.pdf)
- IREA Green Valley 230kV Delivery Point (.pdf)
- IREA Missile Site 230 kV Delivery Point (.pdf)
- Malta 230/115 kV, 100 MVA #2 (.pdf)
- Parachute 45 MVAR Capacitor Bank (.pdf)
- Poncha Junction Substation (.pdf)
- Facilities Study PSCo Poncha Junction Tranformer (.pdf)
- System Impact Study Poncha Transformer (.pdf)
- Rifle 138/69 kV 25 MVA Replacement (.pdf)